Building materials stacked on the Scarborough verge
Verge use
Cause
Formwork timber, mesh or blocks can end up on the verge in front of the property while the site is prepared.
Why it matters
City of Moreton Bay accepts temporary depositing of building materials on public land only if it lasts 72 hours or less and covers under 2.5 m x 6 m, with a 1.8 m clear pedestrian path and a $20,000,000 public liability policy. That checklist does not cover concrete trucks or pumps.
Our solution
Book the pour date early, so materials only sit out for the days before the load arrives.
Prevention / next step
Keep materials inside the boundary where you can, and check with council if the truck or pump needs to stand on the footpath.
Signs to watch for:
- No room for materials inside the boundary
- Narrow verge in front of the unit block

