The slab runs short of concrete
Ordering
Cause
Excavation dug deeper than planned, a thickened edge under a shed slab or a soft base can swallow more concrete than the calculation allowed.
Why it matters
If the last section waits too long, a cold joint forms that weakens the slab and shows on the surface.
Our solution
Because the yard is in Narangba, we can usually batch the balance and send it on a short run. Call as soon as you see the shortfall.
Prevention / next step
Measure depth at several points before ordering and let us convert those dimensions into a volume.
Signs to watch for:
- Formwork filling slower than expected
- Low spots in the base